Maryland Code, PUBLIC UTILITIES 12-129
(b) Any wire used to comply with subsection (a) of this section shall:
(1) be an insulated copper tracer wire that is suitable for direct burial and has an American wire gauge (AWG) of at least 10, or an equivalent product;
(2) be installed:
(i) in the same trench as the piping that connects the building to the water supply system or the sewerage system;
(ii) within 12 inches of the piping that connects the building to the water supply system or the sewerage system; and
(iii) with at least one end of the wire terminating above grade in a location that is accessible and resistant to physical damage, such as in a cleanout or next to an external wall of the building; and
(3) run from within 5 feet of an external wall of the building to:
(i) the point where the piping intersects with the water supply system or the sewerage system; or
(ii) the point where the sewerage system disposes of or processes the sewage.
(c) The requirement of subsection (a) of this section with regard to replacement piping connecting a building to a water supply system or a sewerage system:
(1) applies only to a complete replacement of the piping; and
(2) does not apply to a repair or a partial replacement of the piping.