Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Michigan Laws 280.52

  • drain: whenever used in this act , shall include the main stream or trunk and all tributaries or branches of any creek or river, any watercourse or ditch, either open or closed, any covered drain, any sanitary or any combined sanitary and storm sewer or storm sewer or conduit composed of tile, brick, concrete, or other material, any structures or mechanical devices, that will properly purify the flow of such drains, any pumping equipment necessary to assist or relieve the flow of such drains and any levee, dike, barrier, or a combination of any or all of same constructed, or proposed to be constructed, for the purpose of drainage or for the purification of the flow of such drains, but shall not include any dam and flowage rights used in connection therewith which is used for the generation of power by a public utility subject to regulation by the public service commission. See Michigan Laws 280.3
  • in writing: shall be construed to include printing, engraving, and lithographing; except that if the written signature of a person is required by law, the signature shall be the proper handwriting of the person or, if the person is unable to write, the person's proper mark, which may be, unless otherwise expressly prohibited by law, a clear and classifiable fingerprint of the person made with ink or another substance. See Michigan Laws 8.3q
     Upon filing of such application for a new drainage district, the commissioner shall immediately cause a survey to be made by a competent surveyor or engineer to determine the area which would be drained by the proposed drain, and the route and type of construction of the drain or drains most serviceable for that purpose. He shall not be limited in such determination to the route described in the application. In any county having a board of county auditors, no survey shall be ordered without the approval of such board but if the application shows, or it is determined thereafter, that any such proposed drainage district will affect lands in more than 1 county, the commissioner shall proceed under the portions of chapter 5 of this act relating to intercounty drains, and in such case the approval of the board of county auditors shall not be required. If upon the survey, or if before the survey is made, the commissioner determines that the proposed drain is impractical, he shall take no further action thereon but shall, in writing, notify the persons who delivered the application to him, of that fact, and his reasons for making his determination. If upon the survey the commissioner determines the proposed drain to be practical, he shall lay out a drainage district, prepare and file in the office of the drain commissioner a description of the drainage district, which may be described by its boundaries of highways and streets and tracts and parcels of land including therein all highways and streets, townships, cities and villages or by a description of all tracts or parcels of land, highways, townships, cities and villages which would be benefited by the construction of the proposed drain, and which would be liable to an assessment therefor, should the drain be constructed as hereinafter provided. The commissioner shall obtain from the county treasurer a statement showing as near as may be the amount of taxes and special assessments levied against the lands in the proposed drainage district on the tax rolls for the 3 years next preceding, and the amount of such taxes and assessments remaining unpaid, and if it appears from the statement that 33 1/3% or more of the lands in the proposed drainage district have been returned as tax delinquent and still remain delinquent, no further action shall be taken.