(1) A local agency may apply to the department for a grant under this part.
    (2) A grant shall be made in an amount equal to 1/2 that portion of the cost of construction of collecting sewers, computed upon the cost of the current year’s project only, in excess of 10% of the state equalized value of all taxable property within the political boundaries of the unit of government served by the collecting sewers certified under subsection (2) of section 4906 or $1,000,000.00, whichever is less.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Michigan Laws 324.4905

  • Collecting sewers: means lateral, branch, submain, and trunk sewers consisting of pipes or conduits including pumps, lift stations, force mains, and other appurtenances necessary for a system to prevent or eliminate discharges of raw or inadequately treated sewage of human origin into any waters of the state. See Michigan Laws 324.4901
  • Construction: means the engineering, architectural, legal, fiscal, and economic investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other similar actions necessary to the construction of collecting sewers; the installation, erection, and building of collecting sewers; and the inspection and supervision of the construction of such sewers. See Michigan Laws 324.4901
  • Department: means the director of the department of natural resources or his or her designee to whom the director delegates a power or duty by written instrument. See Michigan Laws 324.301
  • state: when applied to the different parts of the United States, shall be construed to extend to and include the District of Columbia and the several territories belonging to the United States; and the words "United States" shall be construed to include the district and territories. See Michigan Laws 8.3o
    (3) Grants are subject to the following limitations:
    (a) A grant shall not be made for collecting sewers required under the subdivision control act of 1967, Act No. 288 of the Public Acts of 1967, being section 560.101 to 560.293 of the Michigan Compiled Laws.
    (b) A grant shall not be made for collecting sewers for which a federal grant has been made if the amount of the federal grant equals or exceeds the amount of the state grant that the collecting sewers would have received if there had been no federal grant. If the amount of the federal grant made for the collecting sewers is less than the amount of the state grant that the collecting sewers would have received if there had not been a federal grant, the amount of the state grant made for the collecting sewers shall not exceed the difference between the state grant that the collecting sewers would have received if there had not been a federal grant, and the federal grant.
    (c) A grant shall not be made for collecting sewers, the construction of which would result in the discharge of untreated or inadequately treated sewage to the waters of the state.
    (d) A grant shall not be made unless the local agency has received approval by the department of an official pollution control plan as required by section 7 and 8 of Act No. 329 of the Public Acts of 1966, being section 323.117 and 323.118 of the Michigan Compiled Laws, and the collecting sewers are in conformity with the official plan.
    (e) A grant shall not be made for collecting sewers which the department determines would not meet an existing or imminent need or would constitute a noneconomic or speculative project.
    (f) A local agency shall not be allotted more than 2% of the fund.