Minnesota Statutes 161.3414 – Determination to Use Design-Build Selection Method
Subdivision 1.General criteria.
A design-build contracting procedure authorized under sections 161.3410 to 161.3426 may be used for a specific project only after the commissioner determines that awarding a design-build contract will serve the public interest.
Subd. 2.Specific criteria.
Terms Used In Minnesota Statutes 161.3414
- Contract: A legal written agreement that becomes binding when signed.
- state: extends to and includes the District of Columbia and the several territories. See Minnesota Statutes 645.44
Terms Used In Minnesota Statutes 161.3414
- Contract: A legal written agreement that becomes binding when signed.
- state: extends to and includes the District of Columbia and the several territories. See Minnesota Statutes 645.44
The commissioner shall use the following criteria as the minimum basis for determining when to use the design-build method of project delivery:
(1) the extent to which it can adequately define the project requirements in a proposed scope of the design and construction desired;
(2) the time constraints for delivery of the project;
(3) the capability and experience of potential contractors with the design-build method of project delivery or similar experience;
(4) the suitability of the project for use of the design-build method of project delivery with respect to time, schedule, costs, and quality factors;
(5) the capability of the Department of Transportation to manage the project, including the employment of experienced personnel or outside consultants;
(6) the capability of the Department of Transportation to oversee the project with individuals or design-build firms who are familiar and experienced with the design-build method of project delivery or similar experience;
(7) the lack of ability and availability of any current state employee to perform the services called for by the contract;
(8) the original character of the product or the services;
(9) the work to be performed on the project is necessary to the agency’s achievement of its statutory responsibilities and there is statutory authority to enter into the contract; and
(10) other criteria the commissioner deems relevant and states in writing in its determination to utilize the design-build method of project delivery.