Minnesota Statutes 103E.265 – Order for Detailed Survey and Survey Report
Current as of: 2023 | Check for updates
|
Other versions
Subdivision 1.Order.
When the preliminary hearing order is filed with the auditor, the drainage authority shall order the engineer to make a detailed survey with plans and specifications for the proposed drainage project and submit a detailed survey report to the drainage authority as soon as possible.
Subd. 2.Waiver.
Terms Used In Minnesota Statutes 103E.265
- Preliminary hearing: A hearing where the judge decides whether there is enough evidence to make the defendant have a trial.
Terms Used In Minnesota Statutes 103E.265
- Preliminary hearing: A hearing where the judge decides whether there is enough evidence to make the defendant have a trial.
The drainage authority may waive the detailed survey order and the detailed survey if it determines that adequate data, plans, and specifications have been furnished by a United States engineer.