Montana Code 71-3-604. Duration of lien
Current as of: 2023 | Check for updates
|
Other versions
71-3-604. Duration of lien. No lien provided for in this part binds any sawlogs, piling, railroad ties, cordwood, or other timber or lumber and shingles for a longer period than 8 calendar months after the claim as herein provided has been filed, unless a civil action be commenced in a proper court within that time to enforce the same. However, in case such civil action so commenced should for any cause, other than the merits, be dismissed, then the lien shall continue for the term of 1 calendar month, if the 8 months have expired to permit the commencement of another action thereon, which shall be as effective in prolonging the lien as if it had been entered during the term of 8 months hereinbefore stated.
Terms Used In Montana Code 71-3-604
- Lien: A claim against real or personal property in satisfaction of a debt.
- lumber: as used in this part , means all logs or other timber sawed or split for use, including beams, joists, planks, boards, shingles, laths, staves, hoops, and every article of any nature or description manufactured from sawlogs or other timber. See Montana Code 71-3-601