Montana Code 82-4-124. Permit — authority under and renewal
Current as of: 2023 | Check for updates
|
Other versions
82-4-124. Permit — authority under and renewal. A mine-site location permit shall authorize the applicant to engage in preparatory work upon the area described in the application and designated in the permit for a period of 1 year from the date of issuance and is renewable until the applicant has applied for and received a strip-mining or underground-mining permit in accordance with part 2 of this chapter.
Terms Used In Montana Code 82-4-124
- Preparatory work: means all onsite disturbances, excluding prospecting, associated with the initiation of a new strip mine or underground mine, including but not limited to the construction of railroad spurs or loops, buildings to house mining operations, roads, storage and train load-out facilities, transmission lines, erection of draglines and loading shovels, and other associated facilities. See Montana Code 82-4-103