Within 12 months after the expiration date in a permit issued under this chapter, or of the completion of any excavation, whichever occurs first, the owner of the excavated land shall have completed the reclamation of the areas affected by the excavation to meet each of the following minimum standards or when such excavation is not subject to a permit under this chapter pursuant to N.H. Rev. Stat. § 155-E:2, to meet each of the following express standards:
I. Except for exposed rock ledge, all areas which have been affected by the excavation or otherwise stripped of vegetation shall be spread with topsoil or strippings, if any, but in any case covered by soil capable of sustaining vegetation, and shall be planted with seedlings or grass suitable to prevent erosion. Areas visible from a public way, from which trees have been removed, shall be replanted with tree seedlings, set out in accordance with acceptable horticultural practices.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In New Hampshire Revised Statutes 155-E:5

  • following: when used by way of reference to any section of these laws, shall mean the section next preceding or following that in which such reference is made, unless some other is expressly designated. See New Hampshire Revised Statutes 21:13
  • Statute: A law passed by a legislature.

II. Earth and vegetative debris resulting from the excavation shall be removed or otherwise lawfully disposed of.
III. All slopes, except for exposed ledge, shall be graded to natural repose for the type of soil of which they are composed so as to control erosion or at a ratio of horizontal to vertical proposed by the owner and approved by the regulator. Changes of slope shall not be abrupt, but shall blend with the surrounding terrain.
IV. The elimination of any standing bodies of water created in the excavation project as may constitute a hazard to health and safety.
V. The topography of the land shall be left so that water draining from the site leaves the property at the original, natural drainage points and in the natural proportions of flow. For excavation projects which require a permit from the department of environmental services pursuant to N.H. Rev. Stat. § 485-A:17, the provisions of that statute, and rules adopted under it, shall supersede this paragraph as to areas of excavation sites covered thereby. The excavator shall file a copy of permits issued under N.H. Rev. Stat. § 485-A:17 with the regulator.