Terms Used In Tennessee Code 65-31-108

  • Board: means the underground utility damage enforcement board, created by §. See Tennessee Code 65-31-102
  • Code: includes the Tennessee Code and all amendments and revisions to the code and all additions and supplements to the code. See Tennessee Code 1-3-105
  • Contract: A legal written agreement that becomes binding when signed.
  • Damage: includes the substantial weakening of structural or lateral support of an underground utility, penetration or destruction of any protective coating, housing or other protective device of an underground utility, the partial or complete severance of an underground utility and rendering any underground utility inaccessible. See Tennessee Code 65-31-102
  • demolition: means any operation by which a structure or mass of material is wrecked, razed, rendered, moved or removed by means of any tools, equipment, or discharge of explosives. See Tennessee Code 65-31-102
  • Evidence: Information presented in testimony or in documents that is used to persuade the fact finder (judge or jury) to decide the case for one side or the other.
  • Excavator: means any person who engages in activities described in subdivisions (A) and (B) in the definition of "excavate" contained in this section. See Tennessee Code 65-31-102
  • Impending emergency: means circumstances potentially dangerous to life, health, property, the environment or the repair or restoration of service, which would likely develop into an emergency, as defined in §. See Tennessee Code 65-31-102
  • Location: means the proposed area for which digging or excavating is scheduled within three (3) to ten (10) working days, such area not to exceed two thousand feet (2,000') in length unless an excavator and an operator or an operator's designated representative, such as a one-call service, agree to a larger area. See Tennessee Code 65-31-102
  • Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
  • One-Call Service: means a telephone notification service described in §. See Tennessee Code 65-31-102
  • Operator: means any person who owns or operates a utility. See Tennessee Code 65-31-102
  • Person: means any individual. See Tennessee Code 65-31-102
  • Property: includes both personal and real property. See Tennessee Code 1-3-105
  • Proposed area of excavation: means a general surface location which excavators are to furnish to operators of underground utilities or to a one-call service as defined in §. See Tennessee Code 65-31-102
  • State: when applied to the different parts of the United States, includes the District of Columbia and the several territories of the United States. See Tennessee Code 1-3-105
(1)

(A) Each operator notified in accordance with § 65-31-106 shall stake or otherwise mark, prior to the noticed time of the proposed excavation or demolition, the surface of the tract or parcel of land affected by the excavation or demolition to indicate the approximate location of all its underground utilities that may be damaged as a result of the excavation or demolition. The operator shall not charge the person giving notice to the one-call service, the excavator, or property owner for the marking of its facilities. However, an operator may recover the costs of the marking of its facilities from customers in an appropriate ratemaking procedure. The operator shall not be required to indicate the depth of any such utility, but only the approximate ground location under which the utility is located. Such staking or other marking shall utilize the following color code:

(i) SAFETY RED shall be used to mark electric power distribution and transmission facilities;
(ii) HIGH VISIBILITY SAFETY YELLOW shall be used to mark gas and oil distribution and transmission facilities;
(iii) SAFETY ALERT ORANGE shall be used to mark telephone, telegraph, cable television, video, and other telecommunications facilities;
(iv) SAFETY PRECAUTION BLUE shall be used to mark water systems facilities;
(v) SAFETY GREEN shall be used to mark sewer systems facilities; and
(vi) SAFETY PURPLE shall be used to mark reclaimed water.
(B) In the event more than one (1) operator uses the same color code under subdivision (a)(1)(A), each operator using the same color shall include a distinctive marking, such as the initials of the operator’s name or other marking, that appropriately identifies each operator and sufficiently distinguishes each operator’s marking from any other operator authorized to use the same color under subdivision (a)(1)(A).
(2) Notwithstanding subdivision (a)(1), the underground utility damage enforcement board may establish, by rule, best practices for uniform color code and marking consistent with this part. The rules may include stakes, flags, non-permanent paint, or other low impact marking practices. Rules must be promulgated in accordance with the Uniform Administrative Procedures Act, compiled in title 4, chapter 5.
(3) Notwithstanding any law to the contrary, marking methods established by subdivisions (a)(1) and (2) shall be the methods of marking underground facilities in this state.
(b) Each operator participating in a one-call service that has been notified in accordance with § 65-31-106 shall notify the one-call service that the operator has marked the approximate location of all of its underground utilities as required by this section or that the operator has no underground utilities in the proposed area of excavation. The operator shall provide this notice to the one-call service in accordance with procedures adopted by the one-call service for this notification. This notice shall fulfill the operator’s obligation set forth in subsection (e). When each operator notified in accordance with § 65-31-106 has notified the one-call service that its underground utilities in the proposed area of excavation have been marked or that the operator has no underground utilities in the proposed area of excavation, the person responsible for the excavation or demolition may immediately proceed with the excavation or demolition, notwithstanding the minimum three-working-day notice requirement before excavation or demolition can begin set forth in § 65-31-106(a).
(c) An excavator shall exercise reasonable care to avoid damage caused by an excavation or demolition within the safety zone around the marked location of the underground utilities by hand digging when practical, utilizing pneumatic hand tools, or utilizing mechanical or technical methods approved by the facility owner or operator. Hand digging and noninvasive methods are not required for removal of pavement or concrete. As used in this subsection (c), “safety zone” means a strip of land at least four feet (4′) wide, but not wider than the width of the utility plus two feet (2′) on either side of the utility.
(d) If, upon arrival at the site of a proposed excavation, the excavator observes clear evidence of the presence of an unmarked utility in the area of the proposed excavation, the excavator shall not begin excavating until an additional notice is made to the one-call. The excavator may then proceed, exercising reasonable care to avoid damage to the utility which may be caused by such excavation or demolition.
(e) If no facilities exist in the tract or parcel of land, the operators shall make a reasonable effort to so advise the individual who initiated the request, provided the request is received in accordance with § 65-31-106.
(f) The approximate location of underground utilities does not include a designation of location as to depth below the surface of the ground. Excavators must use reasonable care to ascertain for themselves the exact depth of the underground utilities below the surface of the ground. If, after so ascertaining, the excavator learns that its excavation or demolition is likely to interfere with the operation of the underground utility facilities, it must again notify the affected operator of such underground utility facilities and reasonably cooperate with the operator of the underground utility facilities to conduct its excavation or demolition in such a way that the operations of the underground utility facilities are not disturbed or the affected underground utility facilities are placed out of the way of the proposed excavation or demolition.
(g) Each operator notified in accordance with § 65-31-109, shall within two (2) hours stake or otherwise mark, utilizing the color code set forth in subsection (a), the surface of the tract or parcel of land affected by the excavation or demolition to indicate the approximate location of all its underground utilities that may be damaged as a result of the excavation or demolition.
(h) Each operator notified of an impending emergency, as defined in § 65-31-102, shall stake or otherwise mark, prior to the noticed time of the proposed excavation or demolition, utilizing the color code set forth in subsection (a), the surface of the tract or parcel of land affected by the excavation or demolition to indicate the approximate location of all its underground utilities that may be damaged as a result of the excavation or demolition.
(i) Any contract locator acting on behalf of an operator is subject to this section.