Rhode Island General Laws 16-105-3. Roles and responsibilities
The school building authority roles and responsibilities shall include:
(1) Management of a system with the goal of ensuring equitable and adequate school housing for all public school children in the state;
(2) Prevention of the cost of school housing from interfering with the effective operation of the schools;
(3) Management of school housing aid in accordance with statute;
(4) Reviewing and making recommendations to the council on elementary and secondary education on necessity of school construction applications for state school housing aid and the school building authority capital fund, based on the recommendations of the school building authority advisory board;
(5) Promulgating, managing, and maintaining school construction regulations, standards, and guidelines applicable to the school housing program, based on the recommendations of the school building authority advisory board, created in § 16-105-8. Said regulations shall require conformance with the minority business enterprise requirements set forth in § 37-14.1-6;
(6) Developing a prequalification and review process for prime contractors, architects, and engineers seeking to bid on projects in excess of ten million dollars ($10,000,000) in total costs subject to inflation. Notwithstanding any general laws to the contrary, a prequalification shall be valid for a maximum of two (2) years from the date of issuance. Factors to be considered by the school building authority in granting a prequalification to prime contractors shall include, but not be limited to, the contractor’s history of completing complex projects on time and on budget, track record of compliance with applicable environmental and safety regulations, evidence that completed prior projects prioritized the facility’s future maintainability, and compliance with applicable requirements for the use of women and minority owned subcontractors;
(i) At least annually, a list of prequalified contractors, architects, and engineers shall be publicly posted with all other program information;
(7) Providing technical assistance and guidance to school districts on the necessity of school construction application process;
(8) Providing technical advice and assistance, training, and education to cities, towns, and/or local education agencies and to general contractors, subcontractors, construction or project managers, designers and others in planning, maintenance, and establishment of school facility space;
(9) Developing a project priority system, based on the recommendations of the school building authority advisory board, in accordance with school construction regulations for the school building authority capital fund, subject to review and, if necessary, to be revised on intervals not to exceed five (5) years. Project priorities shall include, but not be limited to, the following order of priorities:
(i) Projects to replace or renovate a building that is structurally unsound or otherwise in a condition seriously jeopardizing the health and safety of school children where no alternative exists;
(ii) Projects needed to prevent loss of accreditation;
(iii) Projects needed for the replacement, renovation, or modernization of the HVAC system in any schoolhouse to increase energy conservation and decrease energy-related costs in said schoolhouse;
(iv) Projects needed to replace or add to obsolete buildings in order to provide for a full range of programs consistent with state and approved local requirements; and
(v) Projects needed to comply with mandatory, instructional programs;
(10) Maintaining a current list of requested school projects and the priority given them;
(11) Collecting and maintaining readily available data on all the public school facilities in the state;
(12) Collecting, maintaining, and making publicly available quarterly progress reports of all ongoing school construction projects that shall include, at a minimum, the costs of the project and the time schedule of the project;
(13) Recommending policies and procedures designed to reduce borrowing for school construction programs at both state and local levels;
(14) At least every five (5) years, conducting a needs survey to ascertain the capital construction, reconstruction, maintenance, and other capital needs for schools in each district of the state, including public charter schools;
(15) Developing a formal enrollment projection model or using projection models already available;
(16) Encouraging local education agencies to investigate opportunities for the maximum utilization of space in and around the district;
(17) Collecting and maintaining a clearinghouse of prototypical school plans that may be consulted by eligible applicants;
(18) Retaining the services of consultants, as necessary, to effectuate the roles and responsibilities listed within this section;
(19) No district shall receive a combined total of more than twenty (20) incentive percentage points for projects that commence construction by December 30, 2023, and five (5) incentive points for projects that commence construction thereafter; provided further, these caps shall be in addition to amounts received under §§ 16-7-40(a)(1) and 16-7-40(a)(2). Furthermore, a district’s share shall not be decreased by more than half of its regular share irrespective of the number of incentive points received, nor shall a district’s state share increase by more than half of its regular share, including amounts received under §§ 16-7-40(a)(1) and 16-7-40(a)(2), irrespective of the number of incentive points received. Notwithstanding any provision of the general laws to the contrary, the reimbursement or aid received under this chapter or chapter 38.2 of Title 45 shall not exceed one hundred percent (100%) of the sum of the total project costs plus interest costs. If a two hundred and fifty million dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot, projects approved between May 1, 2015, and January 1, 2018, are eligible to receive incentive points (above and beyond what the project was awarded at the time of approval) pursuant to § 16-7-39 and § 16-7-40. Provided, however, any project approved during this time period with a project cost in excess of one million five hundred thousand dollars ($1,500,000), which does not include an owner’s program manager and a commissioning agent, shall only be eligible to receive five (5) incentive points. Incentive points awarded pursuant to the provisions of this subsection shall only be applied to reimbursements occurring on or after July 1, 2018. Any project approved between May 1, 2015, and January 1, 2018, that is withdrawn and/or resubmitted for approval shall not be eligible for any incentive points.
History of Section.
P.L. 2015, ch. 141, art. 9, § 2; P.L. 2018, ch. 47, art. 9, § 3.
Terms Used In Rhode Island General Laws 16-105-3
- Equitable: Pertaining to civil suits in "equity" rather than in "law." In English legal history, the courts of "law" could order the payment of damages and could afford no other remedy. See damages. A separate court of "equity" could order someone to do something or to cease to do something. See, e.g., injunction. In American jurisprudence, the federal courts have both legal and equitable power, but the distinction is still an important one. For example, a trial by jury is normally available in "law" cases but not in "equity" cases. Source: U.S. Courts
- Evidence: Information presented in testimony or in documents that is used to persuade the fact finder (judge or jury) to decide the case for one side or the other.
- Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
- Statute: A law passed by a legislature.