Rhode Island General Laws 45-14-1.1. Recording of sewer system
Starting on January 1, 2012, all cities and towns that own, operate, manage or control a sewer system shall require as-built drawings and plans on any new sewer main extension to be submitted to the sewer authority. In addition, an as-built record drawing and plans shall be submitted to the sewer authority for any sewer main upgrade or repair that deviates in horizontal or vertical alignment from the existing sewer main horizontal or vertical alignment. The preparation and submission of such as-built drawings and plans shall be the responsibility of the person that each city and town has designated either by ordinance or by contract. All cities and towns shall determine the form in which such drawings and plans shall be submitted.
History of Section.
P.L. 2009, ch. 92, § 3; P.L. 2009, ch. 103, § 3.
Terms Used In Rhode Island General Laws 45-14-1.1
- Contract: A legal written agreement that becomes binding when signed.
- person: may be construed to extend to and include co-partnerships and bodies corporate and politic. See Rhode Island General Laws 43-3-6
- town: may be construed to include city; the words "town council" include city council; the words "town clerk" include city clerk; the words "ward clerk" include clerk of election district; the words "town treasurer" include city treasurer; and the words "town sergeant" include city sergeant. See Rhode Island General Laws 43-3-9