South Carolina Code 11-35-3005. Project delivery methods authorized
(a) design-bid-build;
(b) construction management at-risk;
(c) operations and maintenance;
(d) design-build;
(e) design-build-operate-maintain; and
(f) design-build-finance-operate-maintain.
(2) In addition to those methods identified in item (1), the board, by regulation, and the State Engineer, in accordance with § 11-35-3010, may:
(a) approve as an alternate project delivery method any combination of design, construction, finance, and services for operations and maintenance of an infrastructure facility; and
(b) allow or require the governmental body to follow any of the additional procedures established by § 11-35-3024.
(3) Participation in a report or study that is later used in the preparation of design requirements for a project does not disqualify a firm from participating as a member of a proposing team in a construction management at-risk, design-build, design-build-operate-maintain, or design-build-finance-operate-maintain procurement unless the participation provides the business with a substantial competitive advantage. In the Manual for Planning and Execution of State Permanent Improvements, the State Engineer may establish guidance for the application of this item by governmental bodies.