No design-build request for proposals may include detailed designs or detailed drawings prepared by the criteria developer. The request may, however, include drawings of existing conditions and any preliminary conceptual sketches necessary to illustrate the information required by subdivision 5-18B-29(4). Each conceptual drawing shall contain the minimum information necessary to convey the requirements. No design-build request for proposals may include detailed construction specifications. Any design and construction standards in the request for proposals shall be performance standards only.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Source: SL 2010, ch 31, § 69.