For purposes of this part, the prevailing wage rate shall be determined as follows:

(1) Every highway contractor, as herein defined, in this state, shall have the right to certify, on contracts entered into, to the commission, on or before October 31 in each year that a determination is to be made, the following:

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Tennessee Code 12-4-405

  • Commission: means the prevailing wage commission. See Tennessee Code 12-4-402
  • Highway: includes public bridges and may be held equivalent to the words "county way" "county road" or "state road". See Tennessee Code 1-3-105
  • Highway contractor: means any contractor, subcontractor, person, firm, or corporation engaged in a state construction project for the purpose of building, rebuilding, locating, relocating, or repairing any public highway. See Tennessee Code 12-4-402
  • Prevailing wage: means the rate of pay as determined according to this part. See Tennessee Code 12-4-402
  • State: when applied to the different parts of the United States, includes the District of Columbia and the several territories of the United States. See Tennessee Code 1-3-105
  • written: includes printing, typewriting, engraving, lithography, and any other mode of representing words and letters. See Tennessee Code 1-3-105
  • Year: means a calendar year, unless otherwise expressed. See Tennessee Code 1-3-105
(A) Copies of payroll records for the immediate preceding calendar quarter by area as defined in subdivision (2); and
(B) The numbers of hours worked and the straight time rate per hour paid for such hours in each of the classifications referred to in this part by area as defined in subdivision (2) for the immediate preceding calendar quarter;
(2) For purposes of calculating the prevailing wage rate for workers employed by highway contractors, the state shall be deemed to consist of one (1) statewide area;
(3) For purposes of determining the prevailing wage rate for workers employed by highway contractors, the commission may issue classifications of crafts of workers including, but not limited to, the following: bricklayers; iron workers, structural; iron workers, reinforcing; carpenters or leadspersons; cement masons; nozzlepersons or gunpersons (gunite); painters or sandblasters; shovel operators; backhoe operators; crane operators; end loaders; pile driver operators; motor patrols, finish; concrete paver operators; mechanics, Class I; mechanics, Class II; motor patrols (rough); bulldozer or push dozer operators; scraper operators; trenching machine operators; central mixing (asphalt or concrete); tractors, booms and hoists; concrete finishing machines; soil cement machines; asphalt pavers; rollers, high type; spreaders, self propelled; distributors, bituminous; roller, other than finish; tractor, crawler, utility; dozers or loaders, stock piles only; concrete mixers, less than one (1) yard; mulchers or seeders; earth drills; scale operators; tractors, farm; curb machines; ditch pavers; pump operators; concrete saws; guardrail erectors; sign erectors; motor crane drivers; fence erectors; firefighters; asphalt rakers; tract drill operators; concrete edgers; powder persons; form setters, steel rods; air tool operators; mortar mixers; chain saws; pipe layers; concrete rubbers; laborers; flaggers; oilers; welder’s helpers; mechanic’s helpers; electricians; truck drivers, two (2) and three (3) axles; truck drivers, four (4) and five (5) axles or more or heavy duty off-the-road trucks; welders, receive rate for craft performing operation to which welding is incidental;
(4) The prevailing wage rate for each area specified in subdivision (2) shall be determined by calculating the average hourly rate of pay for each classification referred to in subdivision (3). The commission shall determine the prevailing wage annually for highway construction from the documentation certified to the commission pursuant to subdivision (1). The commission, if it ascertains that current economic conditions warrant, can adjust the final wage determination as developed by the documentation certified to the commission by adding to or subtracting from the determination a percentage factor of not more than six percent (6%), based on the previous year’s prevailing wage rates. Such determination shall be effective until the next determination of the prevailing wage rate pursuant to the terms hereof, unless herein otherwise specifically provided. The prevailing wage rate must be determined pursuant to this part and the failure of any highway contractor or contractors to provide the documentation referred to in subdivision (1) shall not affect such determination;
(5)

(A) The commission shall determine the prevailing wage rate pursuant to the terms of this part and give notice thereof on or before December 1 of each year a determination is to be made. The commission shall give notice of such prevailing wage rate to all highway contractors who submitted documentation in accordance with subdivision (1) and to any others making written request for such notice. Such notice shall include the time and place of the public hearing required by § 12-4-406. The commission shall take all reasonable steps to verify the survey results submitted to it by highway contractors pursuant to this part, and may, at any time, after first holding a public hearing thereon, adjust wage rates so that they reflect only survey data which has been verified by the commission;
(B) The prevailing wage commission is urged to continue its efforts to develop an internet application for the submission of survey forms by highway contractors and periodically update the general assembly on the progress of such development; and
(6) Until such time as the commission makes a prevailing wage rate determination pursuant to this part, the prevailing wage rate in effect on April 23, 1975, shall be considered to be the prevailing wage rate.