(a) The commission shall determine the amount of the bond required for each bonded area.
(b) The amount of the bond shall:
(1) reflect the probable difficulty of the reclamation, considering factors including:
(A) topography;
(B) geology of the site;
(C) hydrology; and
(D) revegetation potential; and
(2) be sufficient to assure completion of the reclamation plan if the commission has to perform the work in the event of forfeiture.