Utah Code 11-70-501. Preparation of project area plan — Required contents of project area plan
Current as of: 2024 | Check for updates
|
Other versions
(1) As provided in this section, the fairpark district may adopt a project area plan for the development of some or all of the land within the fairpark district boundary.
Terms Used In Utah Code 11-70-501
- Board: means the fairpark district's governing body, created in Section
11-70-301 . See Utah Code 11-70-101 - Development: means :(5)(a) the demolition, construction, reconstruction, modification, expansion, or improvement of a building, utility, infrastructure, landscape, parking lot, park, trail, recreational amenity, or other facility, including public infrastructure and improvements; and(5)(b) the planning of, arranging for, or participation in any of the activities listed in Subsection (5)(a). See Utah Code 11-70-101
- Development project: means a project for the development of land within a project area. See Utah Code 11-70-101
- Fair park authority: means the State Fair Park Authority created in Section
11-68-201 . See Utah Code 11-70-101- Fair park land: means the same as that term is defined in Section
11-68-101 . See Utah Code 11-70-101- Fairpark district: means the Utah Fairpark Area Investment and Restoration District, created in Section
11-70-201 . See Utah Code 11-70-101- Fairpark district boundary: means a line or set of lines that:
(12)(a) defines the geographic boundary of the fairpark district, consisting of the interior space within each polygon described by the line or set of lines; and(12)(b) is delineated in the electronic shapefile that is the electronic component of H. See Utah Code 11-70-101- Land: includes :
(18)(a) land;(18)(b) a tenement;(18)(c) a hereditament;(18)(d) a water right;(18)(e) a possessory right; and(18)(f) a claim. See Utah Code 68-3-12.5- Project area: means land described in a project area plan or draft project area plan, where the development project set forth in the project area plan or draft project area plan takes place or is proposed to take place. See Utah Code 11-70-101
- Project area plan: means a written plan that, after its effective date, guides and controls the development within a project area. See Utah Code 11-70-101
- Qualified owner: means an owner of at least 65 contiguous acres of privately owned land within the fairpark district boundary, or the owner's affiliate. See Utah Code 11-70-101
- Qualified stadium: includes parking structures or facilities, lighting facilities, plazas, and open space associated with a stadium described in Subsection (31)(a). See Utah Code 11-70-101
(2) In consultation with the fair park authority board, the fairpark district may adopt a project area plan for the development of some or all of the fair park land.(3) With the consent of a qualified owner, the fairpark district may adopt a project area plan for the development of the qualified owner’s land, including the development and construction of a qualified stadium.(4)(4)(a) To adopt a project area plan, the board shall:(4)(a)(i) prepare a draft project area plan;(4)(a)(ii) give notice as required under Subsection11-70-503 (2);(4)(a)(iii) hold at least one public meeting, as required under Subsection11-70-503 (1); and(4)(a)(iv) after holding at least one public meeting and subject to Subsection (4)(b), adopt the draft project area plan as the project area plan.(4)(b) Before adopting a draft project area plan as the project area plan, the board may make modifications to the draft project area plan that the board considers necessary or appropriate.(5) A project area plan and draft project area plan shall contain:(5)(a) a legal description of the boundary of the project area;(5)(b) the fairpark district’s purposes and intent with respect to the project area; and(5)(c) the board’s findings and determination that:(5)(c)(i) there is a need for the proposed development project to effectuate a public purpose;(5)(c)(ii) there is a public benefit that will result from the proposed development project; and(5)(c)(iii) it is economically sound and feasible to adopt and carry out the project area plan.