Utah Code 38-1a-501. Preliminary notice
Current as of: 2024 | Check for updates
|
Other versions
(1)
Terms Used In Utah Code 38-1a-501
- Alternate means: means a method of filing a legible and complete notice or other document with the registry other than electronically, as established by the division by rule. See Utah Code 38-1a-102
- Claimant: means a person entitled to claim a preconstruction or construction lien. See Utah Code 38-1a-102
- Construction lien: means a lien under this chapter for construction work. See Utah Code 38-1a-102
- Construction project: means an improvement that is constructed pursuant to an original contract. See Utah Code 38-1a-102
- Contract: A legal written agreement that becomes binding when signed.
- Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.
- Designated agent: means the third party the division contracts with as provided in Section 38-1a-202 to create and maintain the registry. See Utah Code 38-1a-102
- Entry number: means the reference number that:(16)(a) the designated agent assigns to each notice or other document filed with the registry; and(16)(b) is unique for each notice or other document. See Utah Code 38-1a-102
- First preliminary notice filing: means a preliminary notice that:
(19)(a) is the earliest preliminary notice filed on a construction project for which the preliminary notice is filed;(19)(b) is filed on a construction project that, at the time the preliminary notice is filed, has not reached final completion; and(19)(c) is not canceled under Section 38-1a-307. See Utah Code 38-1a-102- Lien: A claim against real or personal property in satisfaction of a debt.
- Original contractor: means a person, including an owner-builder, that contracts with an owner to provide preconstruction service or construction work. See Utah Code 38-1a-102
- Owner: means a person who possesses an interest in a project property and contracts with an original contractor for preconstruction service or construction work. See Utah Code 38-1a-102
- Person: means :
(24)(a) an individual;(24)(b) an association;(24)(c) an institution;(24)(d) a corporation;(24)(e) a company;(24)(f) a trust;(24)(g) a limited liability company;(24)(h) a partnership;(24)(i) a political subdivision;(24)(j) a government office, department, division, bureau, or other body of government; and(24)(k) any other organization or entity. See Utah Code 68-3-12.5- Project property: means the real property interest on or for which preconstruction service or construction work is or will be provided. See Utah Code 38-1a-102
- Property: includes both real and personal property. See Utah Code 68-3-12.5
- Real property: Land, and all immovable fixtures erected on, growing on, or affixed to the land.
- real property: includes :
(31)(a) land;(31)(b) a tenement;(31)(c) a hereditament;(31)(d) a water right;(31)(e) a possessory right; and(31)(f) a claim. See Utah Code 68-3-12.5- Registry: means the State Construction Registry under Part 2, State Construction Registry. See Utah Code 38-1a-102
- Subcontractor: means a person that contracts to provide preconstruction service or construction work to:
(34)(a) a person other than the owner; or(34)(b) the owner, if the owner is an owner-builder. See Utah Code 38-1a-102(1)(a) A person who desires to claim a construction lien on real property shall file a preliminary notice with the registry no later than 20 days after the day on which the person commences providing construction work on the real property.(1)(b) Subject to Subsection (1)(c), a preliminary notice is effective as to all construction work that the person filing the notice provides to the construction project under a single original contract, including construction work that the person provides to more than one supervisory subcontractor under that original contract.(1)(c)(1)(c)(i) A person who desires to claim a construction lien on real property but fails to file a timely preliminary notice within the period specified in Subsection (1)(a) may, subject to Subsection (1)(d), file a preliminary notice with the registry after the period specified in Subsection (1)(a).(1)(c)(ii) A person who files a preliminary notice under Subsection (1)(c)(i) may not claim a construction lien for construction work the person provides to the construction project before the date that is five days after the preliminary notice is filed.(1)(d) Notwithstanding Subsections (1)(a) and (c), a preliminary notice has no effect if it is filed more than 10 days after the filing of a notice of completion under Section 38-1a-507 for the construction project for which the preliminary notice is filed.(1)(e) A person who fails to file a preliminary notice as required in this section may not claim a construction lien.(1)(f) A preliminary notice that is filed with the registry as provided in this section is considered to be filed at the time of the first preliminary notice filing.(1)(g) If a preliminary notice filed with the registry includes the tax parcel identification number of a parcel not previously associated in the registry with a construction project, the designated agent shall promptly notify the person who filed the preliminary notice that:(1)(g)(i) the preliminary notice includes a tax parcel identification number of a parcel not previously associated in the registry with a construction project; and(1)(g)(ii) the likely explanation is that:(1)(g)(ii)(A) the preliminary notice is the first filing for the project; or(1)(g)(ii)(B) the tax parcel identification number is incorrectly stated in the preliminary notice.(1)(h) A preliminary notice shall include:(1)(h)(i) the name, address, telephone number, and email address of the person providing the construction work for which the preliminary notice is filed;(1)(h)(ii) the name and address of the person who contracted with the claimant for the construction work;(1)(h)(iii) the name of the record or reputed owner;(1)(h)(iv) the name of the original contractor for construction work under which the claimant is providing or will provide construction work;(1)(h)(v) the address of the project property or a description of the location of the project;(1)(h)(vi) the name of the county in which the project property is located; and(1)(h)(vii)(1)(h)(vii)(A) the tax parcel identification number of each parcel included in the project property;(1)(h)(vii)(B) the entry number of a previously filed notice of construction loan under Section 38-1a-601 on the same project;(1)(h)(vii)(C) the entry number of a previously filed preliminary notice on the same project that includes the tax parcel identification number of each parcel included in the project property; or(1)(h)(vii)(D) the entry number of the building permit issued for the project.(1)(i) A preliminary notice may include:(1)(i)(i) the subdivision, development, or other project name applicable to the construction project for which the preliminary notice is filed; and(1)(i)(ii) the lot or parcel number of each lot or parcel that is included in the project property.(2)(2)(a) Except as provided in Subsection (2)(b), the burden is upon the person filing the preliminary notice to prove that the person has substantially complied with the requirements of this section.(2)(b) A person has substantially complied with the requirements of this section if the person files a preliminary notice that links, within the registry, to a preliminary notice filed by an original contractor for the same construction project, using the entry number assigned to the original contractor’s preliminary notice.(2)(c) Substantial compliance with the requirements of Subsections (1)(h)(iii) through (vii) may be established by a person’s reasonable reliance on information in the registry provided by a previously filed:(2)(c)(i) notice of construction loan under Section 38-1a-601;(2)(c)(ii) preliminary notice; or(2)(c)(iii) building permit.(3)(3)(a) Subject to Subsection (3)(b), a person required by this section to give preliminary notice is required to give only one notice for each construction project.(3)(b) If the construction work is provided pursuant to contracts under more than one original contract for construction work, the notice requirements shall be met with respect to the construction work provided under each original contract.(4) A person filing a preliminary notice by alternate means is responsible for verifying and changing any incorrect information in the preliminary notice before the expiration of the time period during which the notice is required to be filed.(5) A person who files a preliminary notice that contains inaccurate or incomplete information may not be held liable for damages suffered by any other person who relies on the inaccurate or incomplete information in filing a preliminary notice. - First preliminary notice filing: means a preliminary notice that: