(1)

Ask a business law question, get an answer ASAP!
Thousands of highly rated, verified business lawyers.
Click here to chat with a lawyer about your rights.

Terms Used In Utah Code 40-8-13

  • Board: means the Board of Oil, Gas, and Mining. See Utah Code 40-8-4
  • City: includes , depending on population, a metro township as defined in Section 10-3c-102. See Utah Code 68-3-12.5
  • Division: means the Division of Oil, Gas, and Mining. See Utah Code 40-8-4
  • Exploration: includes :
              (13)(b)(i) sinking shafts;
              (13)(b)(ii) tunneling;
              (13)(b)(iii) drilling holes and digging pits or cuts;
              (13)(b)(iv) building of roads, and other access ways; and
              (13)(b)(v) constructing and operating other facilities related to the activities described in this Subsection (13)(b). See Utah Code 40-8-4
  • Hearing: means a formal adjudicative proceeding conducted by the board under the board's procedural rules. See Utah Code 40-8-4
  • Land: includes :
         (18)(a) land;
         (18)(b) a tenement;
         (18)(c) a hereditament;
         (18)(d) a water right;
         (18)(e) a possessory right; and
         (18)(f) a claim. See Utah Code 68-3-12.5
  • Land affected: means the surface and subsurface of an area within the state where mining operations are being or will be conducted, including:
              (17)(a)(i) on-site private ways, roads, and railroads;
              (17)(a)(ii) land excavations;
              (17)(a)(iii) exploration sites;
              (17)(a)(iv) drill sites or workings;
              (17)(a)(v) refuse banks or spoil piles;
              (17)(a)(vi) evaporation or settling ponds;
              (17)(a)(vii) stockpiles;
              (17)(a)(viii) leaching dumps;
              (17)(a)(ix) placer areas;
              (17)(a)(x) tailings ponds or dumps; and
              (17)(a)(xi) work, parking, storage, or waste discharge areas, structures, and facilities. See Utah Code 40-8-4
  • Large mining operation: means a mining operation that is not a small mining operation and, for purposes of filing a notice of intention, does not include an exploration mining operation. See Utah Code 40-8-4
  • mineral deposit: means an accumulation of mineral matter in the form of consolidated rock, unconsolidated material, solutions, or occurring on the surface, beneath the surface, or in the waters of the land from which any product useful to man may be produced, extracted, or obtained or which is extracted by underground mining methods for underground storage. See Utah Code 40-8-4
  • Mining operation: means activities conducted on the surface of the land for the exploration for, development of, or extraction of a mineral deposit, including surface mining and the surface effects of underground and in situ mining, on-site transportation, concentrating, milling, evaporation, and other primary processing. See Utah Code 40-8-4
  • Notice: means :
         (20)(a) notice of intention, as defined in this chapter; or
         (20)(b) written information given to an operator by the division describing compliance conditions at a mining operation. See Utah Code 40-8-4
  • Notice of intention: means a notice to commence mining operations, including revisions to the notice. See Utah Code 40-8-4
  • Operator: means a natural person, corporation, association, partnership, receiver, trustee, executor, administrator, guardian, fiduciary, agent, or other organization or representative, either public or private, owning, controlling, or managing a mining operation or proposed mining operation. See Utah Code 40-8-4
  • Order: means written information provided by the division or board to an operator or other parties, describing the compliance status of a permit or mining operation. See Utah Code 40-8-4
  • Owner: means a natural person, corporation, association, partnership, receiver, trustee, executor, administrator, guardian, fiduciary, agent, or other organization or representative, either public or private, owning, controlling, or managing a mineral deposit or the surface of lands employed in mining operations. See Utah Code 40-8-4
  • Permit: means a permit order. See Utah Code 40-8-4
  • Permit order: means an action by the division that:
         (29)(a)
              (29)(a)(i) approves a notice of intention to commence a large mining operation or revise or amend a large mining operation; or
              (29)(a)(ii) declares a notice of intention for a large mining operation deficient;
         (29)(b)
              (29)(b)(i) accepts as complete a notice of intention to commence a small mining operation or revise or amend a small mining operation; and
              (29)(b)(ii) approves the amount and form of surety for a notice of intention; or
         (29)(c) approves a notice of intention to conduct an exploration operation or revise or amend an exploration operation. See Utah Code 40-8-4
  • Person: means an individual, partnership, association, society, joint stock company, firm, company, corporation, or other governmental or business organization. See Utah Code 40-8-4
  • Reclamation: means actions performed during or after mining operations to shape, stabilize, revegetate, or treat the land affected in order to achieve a safe, stable ecological condition and use that is consistent with local environmental conditions. See Utah Code 40-8-4
  • Review proceeding: means a proceeding under this chapter to address a challenge to a permit order. See Utah Code 40-8-4
  • Small mining operations: means mining operations that disturb or will disturb 20 or less surface acres at any given time in an unincorporated area of a county or 10 or less surface acres at any given time in an incorporated area of a county. See Utah Code 40-8-4
  • Substantive public comment: means a public comment that:
         (38)(a) is specific to a proposed action;
         (38)(b) has a direct relationship to the proposed action;
         (38)(c) includes supporting reasons for the division to consider; and
         (38)(d) addresses issues that are within the scope of the division's jurisdiction. See Utah Code 40-8-4
  • Writing: includes :
         (48)(a) printing;
         (48)(b) handwriting; and
         (48)(c) information stored in an electronic or other medium if the information is retrievable in a perceivable format. See Utah Code 68-3-12.5
     (1)(a) Before any operator begins mining operations, or continues mining operations pursuant to Section 40-8-23, the operator shall file a notice of intention for each individual mining operation with the division.
     (1)(b) The notice of intention referred to in Subsection (1)(a) shall include:

          (1)(b)(i) identification of the owners of any interest in a mineral deposit, including any ownership interest in surface land affected by the notice;
          (1)(b)(ii) copies of underground and surface mine maps;
          (1)(b)(iii) locations of drill holes;
          (1)(b)(iv) accurate area maps of existing and proposed operations; and
          (1)(b)(v) information regarding the amount of material extracted, moved, or proposed to be moved, relating to the mining operation.
     (1)(c) The notice of intention for small mining operations shall include a statement that the operator shall conduct reclamation as required by rules promulgated by the board.
     (1)(d) The notice of intention for large mining operations shall include a plan for reclamation of the lands affected as required by rules promulgated by the board.
(2) The division may require that the operator rehabilitate, close, or mitigate the impacts of each drill hole, shaft, or tunnel when no longer needed as part of the mining operation.
(3) Information provided in the notice of intention, and its attachments relating to the location, size, or nature of the deposit that is marked confidential by the operator shall be protected as confidential information by the board and the division and is not a matter of public record unless the board or division obtains a written release from the operator, or until the mining operation has been terminated as provided in Subsection 40-8-21(2).
(4)

     (4)(a) Subject to Subsection (6) for large mining operations, within 30 days from the receipt of a notice of intention, the division shall complete its review of the notice of intention and shall make further inquiries, inspections, or examinations that are necessary to properly evaluate the notice of intention.
     (4)(b) The division shall notify the operator of any objections to the notice of intention and shall grant the operator a reasonable opportunity to take action that may be required to remove the objections or obtain a ruling relative to the objections from the board.
(5) Except for the form and amount of surety, an approval of a notice of intention for small mining operations is not required.
(6)

     (6)(a) The notice of intention for large mining operations shall be reviewed as provided in this Subsection (6).
     (6)(b)

          (6)(b)(i) Within 30 days after receipt of a notice of intention for a large mining operation, the division shall complete the division’s review of the notice of intention for completeness and notify the operator in writing that the notice of intention:

               (6)(b)(i)(A) is complete because the notice of intention is in a form approved by the division on which the operator provides a substantive response to each applicable request for information; or
               (6)(b)(i)(B) is incomplete.
          (6)(b)(ii) If the notice of intention is incomplete, the division shall give the operator a reasonable opportunity to take action required to complete the notice of intention.
     (6)(c) Within five business days of the day on which the division notifies the operator under Subsection (6)(b) that a notice of intention is complete, the division shall:

          (6)(c)(i) submit for publication notice of the notice of intention and an opportunity for public comment:

               (6)(c)(i)(A) one time in the newspapers of general circulation published in the county where the land affected is situated; and
               (6)(c)(i)(B) one time in a newspaper of general circulation in Salt Lake City, Utah;
          (6)(c)(ii) publish notice of the notice of intention and an opportunity for public comment:

               (6)(c)(ii)(A) on a public legal notice website as required in Section 45-1-101; and
               (6)(c)(ii)(B) on the division’s public website; and
          (6)(c)(iii) mail notice of the notice of intention to:

               (6)(c)(iii)(A) the zoning authority of the county or municipality where the land affected is situated; and
               (6)(c)(iii)(B) the owner of record of the land affected.
     (6)(d)

          (6)(d)(i) The division shall accept public comment on a complete notice of intention for 30 days from the day on which notice is posted on the public legal notice website described in Subsection (6)(c)(ii)(A).
          (6)(d)(ii) The division shall include with a notice published under Subsection (6)(c)(ii), an electronic link by which a person may electronically submit public comment in the form and manner required by rule made by the board in accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act.
          (6)(d)(iii) If a person wants to submit public comment through the mail, the person shall submit the public comment in writing in the form and manner required by rule made by the board in accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act.
          (6)(d)(iv) Only a person, municipality, or county who submits a timely, substantive public comment during the public comment period is eligible to seek intervention in a review proceeding for the division’s final permit order on the notice of intention for a large mining operation.
     (6)(e)

          (6)(e)(i) Within 15 days after the close of public comment under Subsection (6)(d), the division shall review the public comments received and identify all substantive public comments.
          (6)(e)(ii) The division shall transmit a copy of the substantive public comments received to the operator and shall file a copy for public inspection at the division.
          (6)(e)(iii) The division may hold a public meeting to discuss issues raised by public comment.
          (6)(e)(iv) If the division determines that a public meeting is necessary, the division shall hold the public meeting within 45 days after the end of the period to review public comments under Subsection (6)(d).
     (6)(f)

          (6)(f)(i) By no later than 30 days of the later of the following, the division shall take an action described in Subsection (6)(f)(ii):

               (6)(f)(i)(A) the day on which time period under Subsection (6)(d) for accepting public comment ends; or
               (6)(f)(i)(B) the day on which the division holds a public hearing under Subsection (6)(e).
          (6)(f)(ii) By no later than the day described in Subsection (6)(f)(i), the division shall:

               (6)(f)(ii)(A) approve the notice of intention; or
               (6)(f)(ii)(B) provide the operator written notice of any deficiency and grant the operator a reasonable opportunity to take an action that is required to remove the deficiency.
     (6)(g) Upon approving a notice of intention, the division shall provide the operator notice of the approval and post a permit order approving the notice of intention on the division’s public website.
(7) An operator may convert a small mining operation to a large mining operation or may convert a large mining operation to a small mining operation by filing a notice of intention with the division requesting the conversion. The division shall review the notice of intention according to the procedures provided in this section for the resulting mining operation.
(8) Within 30 days after receipt of a notice of intention concerning exploration operations, the division will review the notice of intention and approve or disapprove the notice of intention.