§ 73-26-301 Projects authorized
§ 73-26-302 Construction contingent upon sale or lease of water — Preconstruction may proceed if funded

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Utah Code > Title 73 > Chapter 26 > Part 3 - Project Development

  • Construction costs: means all costs related to the development of a project, except the costs of environmental mitigation. See Utah Code 73-26-103
  • Division: means the Division of Water Resources. See Utah Code 73-26-103
  • Lease: A contract transferring the use of property or occupancy of land, space, structures, or equipment in consideration of a payment (e.g., rent). Source: OCC
  • Preconstruction costs: means any of the following costs incurred before project construction begins:
         (6)(a) planning;
         (6)(b) design;
         (6)(c) engineering studies;
         (6)(d) legal work;
         (6)(e) permitting;
         (6)(f) acquisition of land and rights-of-way;
         (6)(g) compensation for impairment of existing water rights;
         (6)(h) environmental studies; or
         (6)(i) any combination of Subsections (6)(a) through (h). See Utah Code 73-26-103
  • Statute: A law passed by a legislature.