A. As used in this section:

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Virginia Code 62.1-44.15:35

  • Board: means the State Water Control Board. See Virginia Code 62.1-44.3
  • Department: means the Department of Environmental Quality. See Virginia Code 62.1-44.15:24
  • Includes: means includes, but not limited to. See Virginia Code 1-218
  • Jurisdiction: (1) The legal authority of a court to hear and decide a case. Concurrent jurisdiction exists when two courts have simultaneous responsibility for the same case. (2) The geographic area over which the court has authority to decide cases.
  • land-disturbing activity: means a man-made change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading, excavating, or filling of land. See Virginia Code 62.1-44.15:24
  • Locality: means a county, city, or town as the context may require. See Virginia Code 1-221
  • Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
  • Permit: means a Virginia Pollutant Discharge Elimination System (VPDES) permit issued by the Board pursuant to § Virginia Code 62.1-44.15:24
  • Process: includes subpoenas, the summons and complaint in a civil action, and process in statutory actions. See Virginia Code 1-237
  • Real property: Land, and all immovable fixtures erected on, growing on, or affixed to the land.
  • State: when applied to a part of the United States, includes any of the 50 states, the District of Columbia, the Commonwealth of Puerto Rico, Guam, the Northern Mariana Islands, and the United States Virgin Islands. See Virginia Code 1-245
  • Subdivision: means the same as that term is defined in § Virginia Code 62.1-44.15:24
  • VESMP: means a program established by a VESMP authority for the effective control of soil erosion and sediment deposition and the management of the quality and quantity of runoff resulting from land-disturbing activities to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources. See Virginia Code 62.1-44.15:24
  • VESMP authority: means the Board or a locality approved by the Board to operate a Virginia Erosion and Stormwater Management Program. See Virginia Code 62.1-44.15:24
  • VSMP: means a program established by the Board pursuant to § Virginia Code 62.1-44.15:24
  • VSMP authority: means the Board when administering a VSMP on behalf of a locality that, pursuant to subdivision B 3 of § Virginia Code 62.1-44.15:24
  • Water quality technical criteria: means standards set forth in regulations adopted pursuant to this article that establish minimum design criteria for measures to control nonpoint source pollution. See Virginia Code 62.1-44.15:24
  • Water quantity technical criteria: means standards set forth in regulations adopted pursuant to this article that establish minimum design criteria for measures to control localized flooding and stream channel erosion. See Virginia Code 62.1-44.15:24
  • Watershed: means a defined land area drained by a river or stream, karst system, or system of connecting rivers or streams such that all surface water within the area flows through a single outlet. See Virginia Code 62.1-44.15:24

“Nutrient credit” or “credit” means a type of offsite option that is a nutrient credit certified pursuant to Article 4.02 (§ 62.1-44.19:12 et seq.).

“Offsite option” means an alternative available, away from the real property where land disturbance is occurring, to address water quality or water quantity technical criteria established pursuant to § 62.1-44.15:28.

“Tributary,” within the Chesapeake Bay watershed, has the same meaning as in § 62.1-44.19:13. For areas outside of the Chesapeake Bay watershed, “tributary” includes the following watersheds: Albemarle Sound, Coastal; Atlantic Ocean, Coastal; Big Sandy; Chowan; Clinch-Powell; New Holston (Upper Tennessee); New River; Roanoke; and Yadkin.

B. No offsite option shall be used in contravention of local water quality-based limitations (i) determined pursuant to subsection B of § 62.1-44.19:14, (ii) adopted pursuant to § 62.1-44.15:33 or other applicable authority, (iii) deemed necessary to protect public water supplies from demonstrated adverse nutrient impacts, or (iv) as otherwise may be established or approved by the Board. Where such a limitation exists, offsite options may be used provided that such options do not preclude or impair compliance with the local limitation.

C. Unless prohibited by subsection B, a VESMP authority or a VSMP authority:

1. May allow the use of offsite options for compliance with water quality and water quantity technical criteria established pursuant to § 62.1-44.15:28, in whole or in part; and

2. Shall allow the use of nutrient credits for compliance with the water quality technical criteria when:

a. Less than five acres of land will be disturbed;

b. The phosphorous water quality reduction requirement is less than 10 pounds per year; or

c. It is demonstrated to the satisfaction of the VESMP or VSMP authority that (i) alternative site designs have been considered that may accommodate onsite best management practices, (ii) onsite best management practices have been considered in alternative site designs to the maximum extent practicable, (iii) appropriate onsite best management practices will be implemented, and (iv) compliance with water quality technical criteria cannot practicably be met onsite. The requirements of clauses (i) through (iv) shall be deemed to have been met if it is demonstrated that onsite control of at least 75 percent of the required phosphorous water quality reduction will be achieved.

D. No VSMP or VESMP authority may grant an exception to, or waiver of, post-development nonpoint nutrient runoff compliance requirements unless offsite options have been considered and found not available.

E. The VSMP or VESMP authority shall require that offsite options approved by the Department or applicable state board achieve the necessary phosphorous water quality reductions prior to the commencement of the land-disturbing activity. A pollutant loading pro rata share program established by a locality pursuant to § 15.2-2243 and approved by the Department or applicable state board prior to January 1, 2011, including those that may achieve nutrient reductions after the commencement of the land-disturbing activity, may continue to operate in the approved manner for a transition period ending July 1, 2014. In the case of a phased project, the land disturber may acquire or achieve the offsite nutrient reductions prior to the commencement of each phase of the land-disturbing activity in an amount sufficient for each such phase. The land disturber shall have the right to select between the use of nutrient credits or other offsite options, except during the transition period in those localities to which the transition period applies.

F. With the consent of the land disturber, in resolving enforcement actions, the VESMP authority or the Board may include the use of offsite options to compensate for (i) nutrient control deficiencies occurring during the period of noncompliance and (ii) permanent nutrient control deficiencies.

G. This section shall not be construed as limiting the authority established under § 15.2-2243; however, under any pollutant loading pro rata share program established thereunder, the subdivider or developer shall be given appropriate credit for nutrient reductions achieved through offsite options. The locality may use funds collected for nutrient reductions pursuant to a locality pollutant loading pro rata share program for nutrient reductions in the same tributary within the same locality as the land-disturbing activity, or for the acquisition of nutrient credits.

H. Nutrient credits shall not be used to address water quantity technical criteria. Nutrient credits shall be generated in the same or adjacent fourth order subbasin, as defined by the hydrologic unit boundaries of the National Watershed Boundary Dataset, as the land-disturbing activity. If no credits are available within these subbasins when the VESMP or VSMP authority accepts the final site design, credits available within the same tributary may be used. The following requirements apply to the use of nutrient credits:

1. Documentation of the acquisition of nutrient credits shall be provided to the VESMP authority and the Department or the VSMP authority in a certification from the credit provider documenting the number of phosphorus nutrient credits acquired and the associated ratio of nitrogen nutrient credits at the credit-generating entity.

2. Until the effective date of regulations establishing application fees in accordance with § 62.1-44.19:20, the credit provider shall pay the Department a water quality enhancement fee equal to six percent of the amount paid for the credits. Such fee shall be deposited into the Virginia Stormwater Management Fund established by § 62.1-44.15:29.

3. For that portion of a site’s compliance with water quality technical criteria being obtained through nutrient credits, the land disturber shall (i) comply with a 1:1 ratio of the nutrient credits to the site’s remaining post-development nonpoint nutrient runoff compliance requirement being met by credit use and (ii) use credits certified as perpetual credits pursuant to Article 4.02 (§ 62.1-44.19:12 et seq.).

4. A VESMP or VSMP authority shall allow the full or partial substitution of perpetual nutrient credits for existing onsite nutrient controls when (i) the nutrient credits will compensate for 10 or fewer pounds of the annual phosphorous requirement associated with the original land-disturbing activity or (ii) existing onsite controls are not functioning as anticipated after reasonable attempts to comply with applicable maintenance agreements or requirements and the use of nutrient credits will account for the deficiency. Upon determination by the VESMP or VSMP authority that the conditions established by clause (i) or (ii) have been met, the party responsible for maintenance shall be released from maintenance obligations related to the onsite phosphorous controls for which the nutrient credits are substituted.

I. The use of nutrient credits to meet post-construction nutrient control requirements shall be accounted for in the implementation of total maximum daily loads and MS4 permits as specified in subdivisions 1, 2, and 3. In order to ensure that the nutrient reduction benefits of nutrient credits used to meet post-construction nutrient control requirements are attributed to the location of the land-disturbing activity where the credit is used, the following account method shall be used:

1. Chesapeake Bay TMDL.

a. Where nutrient credits are used to meet nutrient reduction requirements applicable to redevelopment projects, a 1:1 credit shall be applied toward MS4 compliance with the Chesapeake Bay TMDL waste load allocation or related MS4 permit requirement applicable to the MS4 service area, including the site of the land-disturbing activity, such that the nutrient reductions of redevelopment projects are counted as part of the MS4 nutrient reductions to the same extent as when land-disturbing activities use onsite measures to comply.

b. Where nutrient credits are used to meet post-construction requirements applicable to new development projects, the nutrient reduction benefits represented by such credits shall be attributed to the location of the land-disturbing activity where the credit is used to the same extent as when land-disturbing activities use onsite measures to comply.

c. A 1:1 credit shall be applied toward compliance by a locality that operates a regulated MS4 with its Chesapeake Bay TMDL waste load allocation or related MS4 permit requirement to the extent that nutrient credits are obtained by the MS4 jurisdiction from a nutrient credit-generating entity as defined in § 62.1-44.19:13 independent of or in excess of those required to meet the post-construction requirements.

2. Local nutrient-related TMDLs adopted prior to the land-disturbing activity.

a. Where nutrient credits are used to meet nutrient reduction requirements applicable to redevelopment projects, a 1:1 credit shall be applied toward MS4 compliance with any local TMDL waste load allocation or related MS4 permit requirement applicable to the MS4 service area, including the site of the land-disturbing activity, such that the nutrient reductions of redevelopment projects are counted as part of the MS4 nutrient reductions to the same extent as when land-disturbing activities use onsite measures to comply, provided the nutrient credits are generated upstream of where the land-disturbing activity discharges to the water body segment that is subject to the TMDL.

b. Where nutrient credits are used to meet post-construction requirements applicable to new development projects, the nutrient reduction benefits represented by such credits shall be attributed to the location of the land-disturbing activity where the credit is used to the same extent as when land-disturbing activities use onsite measures to comply, provided the nutrient credits are generated upstream of where the land-disturbing activity discharges to the water body segment that is subject to the TMDL.

c. A 1:1 credit shall be applied toward MS4 compliance with any local TMDL waste load allocation or related MS4 permit requirement to the extent that nutrient credits are obtained by the MS4 jurisdiction from a nutrient credit-generating entity as defined in § 62.1-44.19:13 independent of or in excess of those required to meet the post-construction requirements. However, such credits shall be generated upstream of where the land-disturbing activity discharges to the water body segment that is subject to the TMDL.

3. Future local nutrient-related TMDLs.

This subdivision applies only to areas where there has been a documented prior use of nutrient credits to meet nutrient control requirements in an MS4 service area that flows to or is upstream of a water body segment for which a nutrient-related TMDL is being developed. For a TMDL waste load allocation applicable to the MS4, the Board shall develop the TMDL waste load allocation with the nutrient reduction benefits represented by the nutrient credit use being attributed to the MS4, except when the Board determines during the TMDL development process that reasonable assurance of implementation cannot be provided for nonpoint source load allocations due to the nutrient reduction benefits being attributed in this manner. The Board shall have no obligation to account for nutrient reduction benefits in this manner if the MS4 does not provide the Board with adequate documentation of (i) the location of the land-disturbing activities, (ii) the number of nutrient credits, and (iii) the generation of the nutrient credits upstream of the site at which the land-disturbing activity discharges to the water body segment addressed by the TMDL. Such attribution shall not be interpreted as amending the requirement that the TMDL be established at a level necessary to meet the applicable water quality standard.

2009, c. 364, § 10.1-603.8:1; 2010, c. 686; 2011, c. 523; 2012, cc. 748, 785, 808, 819; 2013, cc. 756, 793; 2015, c. 164; 2016, cc. 68, 758.