Washington Code 18.104.050 – Reports of well construction or decommissioning
Current as of: 2023 | Check for updates
|
Other versions
(1) Any person authorized by this chapter to construct or decommission a well shall furnish a well report to the director within thirty days after the completion of the construction or decommissioning of a well. The director, by rule, shall prescribe the form of the report and the information to be contained therein.
Terms Used In Washington Code 18.104.050
- person: may be construed to include the United States, this state, or any state or territory, or any public or private corporation or limited liability company, as well as an individual. See Washington Code 1.16.080
(2) In the case of a dewatering well project:
(a) A single well construction report may be submitted for all similar dewatering wells constructed with no significant change in geologic formation; and
(b) A single well decommissioning report may be submitted for all similar dewatering wells decommissioned that have no significant change in geologic formation.