Washington Code 36.54.015 – Ferries — Fourteen year long range improvement plan — Contents
Current as of: 2023 | Check for updates
|
Other versions
The legislative authority of every county operating ferries shall prepare, with the advice and assistance of the county engineer, a fourteen year long range capital improvement plan embracing all major elements of the ferry system. Such plan shall include a listing of each major element of the system showing its estimated current value, its estimated replacement cost, and its amortization period.
Terms Used In Washington Code 36.54.015
- Amortization: Paying off a loan by regular installments.
- County engineer: means the county road engineer, county engineer, and engineer, and shall refer to the statutorily required position of county engineer appointed under RCW 36. See Washington Code 36.75.010