All installations of underground utilities made on and after August 9, 1971 shall be recorded on an “as constructed” map and filed with the county engineer of the county in which the underground utilities are installed.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Washington Code 36.88.485

  • County engineer: means the county road engineer, county engineer, and engineer, and shall refer to the statutorily required position of county engineer appointed under RCW 36. See Washington Code 36.75.010