Washington Code 47.56.120 – Toll bridges — Construction directed — Costs
Current as of: 2023 | Check for updates
|
Other versions
In the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.
[ 2008 c 122 § 13; 1977 ex.s. c 151 § 70; 1961 c 13 § 47.56.120. Prior: 1937 c 173 § 4; RRS § 6524-4.]
Terms Used In Washington Code 47.56.120
- Toll bridge: means a bridge constructed or acquired under this chapter, upon which tolls are charged, together with all appurtenances, additions, alterations, improvements, and replacements thereof, and the approaches thereto, and all lands and interests used therefor, and buildings and improvements thereon. See Washington Code 47.56.010