Washington Code 52.14.130 – Low bidder claiming error — Prohibition on later bid for same project
Current as of: 2023 | Check for updates
|
Other versions
A low bidder who claims error and fails to enter into a contract with a fire protection district for a public works project is prohibited from bidding on the same project if a second or subsequent call for bids is made for the project.
[ 1996 c 18 § 10.]
Terms Used In Washington Code 52.14.130
- Contract: A legal written agreement that becomes binding when signed.