Washington Code 70.40.140 – Inspection of project under construction — Certification as to federal funds due
Current as of: 2023 | Check for updates
|
Other versions
From time to time the secretary shall inspect each construction project approved by the surgeon general, and, if the inspection so warrants, the secretary shall certify to the surgeon general that work has been performed upon the project, or purchases have been made, in accordance with the approved plans and specifications, and that payment of an installment of federal funds is due to the applicant.
[ 1979 c 141 § 105; 1949 c 197 § 14; Rem. Supp. 1949 § 6090-73.]
Terms Used In Washington Code 70.40.140
- Secretary: means the secretary of the state department of health;
Washington Code 70.40.020surgeon general: means the surgeon general of the public health service of the United States;
Washington Code 70.40.020