Washington Code 77.100.110 – Cedar river spawning channel — Technical committee — Policy committee
Current as of: 2023 | Check for updates
|
Other versions
The department shall chair a technical committee, which shall review the preparation of enhancement plans and construction designs for a Cedar river sockeye spawning channel. The technical committee shall consist of not more than eight members: One representative each from the department, national marine fisheries service, United States fish and wildlife service, and Muckleshoot Indian tribe; and four representatives from the public utility described in RCW 77.100.130. The technical committee will be guided by a policy committee, also to be chaired by the department, which shall consist of not more than six members: One representative from the department, one from the Muckleshoot Indian tribe, and one from either the national marine fisheries service or the United States fish and wildlife service; and three representatives from the public utility described in RCW 77.100.130. The policy committee shall oversee the operation and evaluation of the spawning channel. The policy committee will continue its oversight until the policy committee concludes that the channel is meeting the production goals specified in RCW 77.100.120.
NOTES:
Effective date—1993 sp.s. c 2 §§ 1-6, 8-59, and 61-79: See RCW 43.300.900.
Project designation—Legislative finding—Severability—1989 c 85: See notes following RCW 77.100.100.
Terms Used In Washington Code 77.100.110
- Oversight: Committee review of the activities of a Federal agency or program.