The operator of a well shall reclaim the land surface within the area disturbed in siting, drilling, completing or producing the well in accordance with the following requirements:

Ask a business law question, get an answer ASAP!
Thousands of highly rated, verified business lawyers.
Click here to chat with a lawyer about your rights.

Terms Used In West Virginia Code 22-6-30

  • Director: means the Secretary of the Department of Environmental Protection as established in article one of this chapter or other person to whom the secretary has delegated authority or duties pursuant to sections six or eight, article one of this chapter. See West Virginia Code 22-6-1
  • Gas: means all natural gas and all other fluid hydrocarbons not defined as oil in this section. See West Virginia Code 22-6-1
  • Oil: means natural crude oil or petroleum and other hydrocarbons, regardless of gravity, which are produced at the well in liquid form by ordinary production methods and which are not the result of condensation of gas after it leaves the underground reservoirs. See West Virginia Code 22-6-1
  • operator: means any person or persons, firm, partnership, partnership association or corporation that proposes to or does locate, drill, operate or abandon any well as herein defined. See West Virginia Code 22-6-1
  • State: when applied to a part of the United States and not restricted by the context, includes the District of Columbia and the several territories, and the words "United States" also include the said district and territories. See West Virginia Code 2-2-10
  • Well: means any shaft or hole sunk, drilled, bored or dug into the earth or into underground strata for the extraction or injection or placement of any liquid or gas, or any shaft or hole sunk or used in conjunction with such extraction or injection or placement. See West Virginia Code 22-6-1

(a) Within six months after the completion of the drilling process, the operator shall fill all the pits for containing muds, cuttings, salt water and oil that are not needed for production purposes, or are not required or allowed by state or federal law or rule and remove all concrete bases, drilling supplies and drilling equipment. Within such period, the operator shall grade or terrace and plant, seed or sod the area disturbed that is not required in production of the well where necessary to bind the soil and prevent substantial erosion and sedimentation. No pit may be used for the ultimate disposal of salt water. Salt water and oil shall be periodically drained or removed, and properly disposed of, from any pit that is retained so the pit is kept reasonably free of salt water and oil.

(b) Within six months after a well that has produced oil or gas is plugged, or after the plugging of a dry hole, the operator shall remove all production and storage structures, supplies and equipment, and any oil, salt water and debris, and fill any remaining excavations. Within such period, the operator shall grade or terrace and plant, seed or sod the area disturbed where necessary to bind the soil and prevent substantial erosion and sedimentation.

The director may, upon written application by an operator showing reasonable cause, extend the period within which reclamation shall be completed, but not to exceed a further six-month period.

If the director refuses to approve a request for extension, the refusal shall be by order.

(c) It shall be the duty of an operator to commence the reclamation of the area of land disturbed in siting, drilling, completing or producing the well in accordance with soil erosion and sediment control plans approved by the director or the director's designate.

(d) The director shall promulgate rules setting forth requirements for the safe and efficient installation and burying of all production and gathering pipelines where practical and reasonable except that such rules shall not apply to those pipelines regulated by the Public Service Commission.