Connecticut General Statutes 16-50kk – Regulations re wind-powered generation
(a) On or before July 1, 2012, the Connecticut Siting Council, in consultation with the Department of Energy and Environmental Protection, shall adopt regulations, in accordance with the provisions of chapter 54, concerning the siting of wind turbines. Such regulations shall include, but not be limited to, (1) a consideration of (A) setbacks, including considerations of tower height and distance from neighboring properties; (B) flicker; (C) a requirement for the developer to decommission the facility at the end of its useful life; (D) ice throw; (E) blade shear; (F) noise; and (G) impact on natural resources; and (2) a requirement for a public hearing for wind turbine projects.
Terms Used In Connecticut General Statutes 16-50kk
- Facility: means : (1) An electric transmission line of a design capacity of sixty-nine kilovolts or more, including associated equipment but not including a transmission line tap, as defined in subsection (e) of this section. See Connecticut General Statutes 16-50i
(b) The Connecticut Siting Council shall not act on any application or petition for siting of a wind turbine until after the adoption of regulations pursuant to subsection (a) of this section.