1. A contractor shall not engage in well construction or reconstruction without first being certified as required in this part and department rules adopted pursuant to this part. Water wells shall not be constructed, reconstructed, or abandoned by a person except as provided in this part or rules adopted pursuant to this part. Within thirty days after construction or reconstruction of a well, a contractor shall provide well information required by rule to the department and the Iowa geological survey.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Iowa Code 455B.187

  • Closure: means actions that will prevent, mitigate, or minimize the threat to public health and the environment posed by a closed sanitary landfill, including but not limited to application of final cover, grading and seeding of final cover, installation of an adequate monitoring system, and construction of ground and surface water diversion structures, if necessary. See Iowa Code 455B.301
  • Department: means the department of natural resources. See Iowa Code 462A.2
  • Department: means the department of natural resources created under section 455A. See Iowa Code 455B.101
  • Director: means the director of the department or the director's designee. See Iowa Code 462A.2
  • Director: means the director of the department or a designee. See Iowa Code 455B.101
  • Person: means an individual, partnership, firm, corporation, or association. See Iowa Code 462A.2
  • property: includes personal and real property. See Iowa Code 4.1
  • Rule: includes "regulation". See Iowa Code 4.1
  • state: when applied to the different parts of the United States, includes the District of Columbia and the territories, and the words "United States" may include the said district and territories. See Iowa Code 4.1
 2. A landowner or the landowner’s agent shall not drill for or construct a new water well without first obtaining a permit for this activity from the department. The department shall not issue a permit to any person for this activity unless the person first registers with the department all wells, including abandoned wells, on the property. The department may delegate the authority to issue a permit to a county board of supervisors or the board’s designee. In the event of such delegation, the department shall retain concurrent authority. The commission shall adopt rules pursuant to chapter 17A to implement this subsection.
 3. The director may charge a fee for permits issued pursuant to this section. All fees collected pursuant to this section shall be deposited into the private water supply system account within the water quality protection fund created in section 455B.183A.
 4. Notwithstanding the provisions of this section, a county board of supervisors or the board’s designee may grant an exemption from the permit requirements to a landowner or the landowner’s agent if an emergency drilling is necessary to meet an immediate need for water. The exemption shall be effective immediately upon approval of the county board of supervisors or the board’s designee. The board of supervisors or the board’s designee shall notify the director within thirty days of the granting of an exemption.
 5. In the case of property owned by a state agency, a person shall not drill for or construct a new water well without first registering with the department the existence of any abandoned wells on the property. The department shall develop a prioritized closure program and time frame for the completion of the program, and shall adopt rules to implement the program.