82-4-381. Annual inspections. (1) The engineer of record shall inspect a tailings storage facility annually during operation or as required during closure pursuant to a reclamation plan under 82-4-336.
Terms Used In Montana Code 82-4-381
- Department: means the department of environmental quality provided for in 2-15-3501. See Montana Code 82-4-303
- Engineer of record: means a qualified engineer who is the lead designer for a tailings storage facility. See Montana Code 82-4-303
- Operator: means a person who has an operating permit issued under 82-4-335. See Montana Code 82-4-303
- Reclamation plan: means the operator's written proposal, as required and approved by the department, for reclamation of the land that will be disturbed. See Montana Code 82-4-303
- Tailings: means the residual materials remaining after a milling process that separates the valuable fraction from the uneconomic fraction of an ore mined by an operator. See Montana Code 82-4-303
- Tailings storage facility: means a facility that temporarily or permanently stores tailings, including the impoundment, embankment, tailings distribution works, reclaim water works, monitoring devices, storm water diversions, and other ancillary structures. See Montana Code 82-4-303
(2)(a) The engineer of record shall prepare a report describing the scope of the inspection and actions recommended to ensure the tailings storage facility is properly operated and maintained.
(b)The engineer of record shall submit the report to the operator and the department and immediately notify the department and the operator if the tailings impoundment presents an imminent threat or the potential for an imminent threat to human health or the environment.
(3)(a) If the report contains recommendations, the operator shall prepare a corrective action plan implementing the recommendations of the engineer of record and an implementation schedule.
(b)The operator shall submit the corrective action plan and schedule to the engineer of record.
(c)The corrective actions proposed by the operator must reasonably be expected to effectively address the recommendations contained in the inspection report. The engineer of record shall verify the proposed corrective actions.
(d)The operator shall submit the corrective action plan verified by the engineer of record and the implementation schedule to the department within 120 days following the date of the inspection.
(e)The operator shall implement the corrective action plan pursuant to the implementation schedule.
(4)The department shall conduct inspections, review records, and take other actions necessary to determine if the tailings storage facility is being operated in a manner consistent with the approved design document and the tailings operation, maintenance, and surveillance manual.
(5)Failure to implement the corrective action plan and the implementation schedule or material deviations from the approved design document or the tailings operation, maintenance, and surveillance manual are subject to the provisions of 82-4-361 and 82-4-362.