Utah Code > Title 54 > Chapter 25 > Part 1 – General Provisions
Current as of: 2024 | Check for updates
|
Other versions
§ 54-25-101 | Definitions |
§ 54-25-102 | Commission rulemaking authority |
Terms Used In Utah Code > Title 54 > Chapter 25 > Part 1 - General Provisions
- Commission: means the Public Service Commission. See Utah Code 54-2-1
- Electrical power delivery quality: means the suitability of power delivered to customers as measured in comparison to accepted industry standards on voltage and power quality. See Utah Code 54-25-101
- Electrical power delivery quality plan: means a plan submitted to the commission in accordance with the requirements of this chapter. See Utah Code 54-25-101
- Qualified utility: means the same as that term is defined in Section 54-17-801. See Utah Code 54-25-101
- State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5
- Utility-scale energy generation system: means an electric generation facility that has a generating capacity of more than two megawatts and is intermittent, non-dispatchable, or controlled by an inverter. See Utah Code 54-25-101