As used in this chapter:

(1) “Electrical power delivery quality” means the suitability of power delivered to customers as measured in comparison to accepted industry standards on voltage and power quality.

Ask a business law question, get an answer ASAP!
Thousands of highly rated, verified business lawyers.
Click here to chat with a lawyer about your rights.

Terms Used In Utah Code 54-25-101

  • Commission: means the Public Service Commission. See Utah Code 54-2-1
  • Qualified utility: means the same as that term is defined in Section 54-17-801. See Utah Code 54-25-101
  • Utility-scale energy generation system: means an electric generation facility that has a generating capacity of more than two megawatts and is intermittent, non-dispatchable, or controlled by an inverter. See Utah Code 54-25-101
(2) “Electrical power delivery quality plan” means a plan submitted to the commission in accordance with the requirements of this chapter.
(3) “Interconnection request” means a request from a utility-scale energy generation system to a qualified utility‘s transmission line.
(4) “Qualified utility” means the same as that term is defined in Section 54-17-801.
(5) “Utility-scale energy generation system” means an electric generation facility that has a generating capacity of more than two megawatts and is intermittent, non-dispatchable, or controlled by an inverter.