A. Notwithstanding other provisions of this chapter, for purposes of subdivision review, permit approval, and issuance of letters for residential development, the Board, Commissioner, and Department of Health shall accept private site evaluations and designs, in compliance with the Board’s regulations for septic systems and other onsite sewage systems, designed and certified by a licensed professional engineer, in consultation with a licensed onsite soil evaluator, or by a licensed onsite soil evaluator. The evaluations and designs included within such submissions shall be certified as complying with the Board’s regulations implementing this chapter.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Virginia Code 32.1-163.5

  • Contract: A legal written agreement that becomes binding when signed.
  • Department: means the State Department of Health. See Virginia Code 32.1-3
  • in writing: include any representation of words, letters, symbols, numbers, or figures, whether (i) printed or inscribed on a tangible medium or (ii) stored in an electronic or other medium and retrievable in a perceivable form and whether an electronic signature authorized by Virginia Code 1-257
  • Licensed onsite soil evaluator: means a person who is licensed under Chapter 23 of Virginia Code 32.1-163
  • Locality: means a county, city, or town as the context may require. See Virginia Code 1-221
  • Regulations: means the Sewage Handling and Disposal Regulations, heretofore or hereafter enacted or adopted by the State Board of Health. See Virginia Code 32.1-163
  • Sewage: means water-carried and non-water-carried human excrement, kitchen, laundry, shower, bath or lavatory wastes, separately or together with such underground, surface, storm and other water and liquid industrial wastes as may be present from residences, buildings, vehicles, industrial establishments or other places. See Virginia Code 32.1-163

B. The Department shall not be required to perform a field check of private evaluations and designs prior to issuing the requested letter, permit or approval; however, the Department may conduct such review of the work and field analysis as deemed necessary to protect the public health and integrity of the Commonwealth’s environment. Within 15 working days from the date of written submission of a request for approval of a site evaluation and design for a single lot construction permit, and within 60 days from the date of written submission of a request for approval of a site evaluation and design for multiple lot certification letters or subdivision review, the Department shall (i) issue the requested letter, permit or approval or (ii) set forth in writing the specific reasons for denial. If the Department fails to take action to approve or disapprove the designs, evaluations, or subdivision reviews within the time specified herein, the designs, evaluations or subdivision reviews shall be deemed approved and the appropriate letter, permit or approval shall be issued. Notwithstanding any other provision of law or the provisions of any local ordinance, counties, cities and towns shall comply with the time limits set forth in this subsection.

C. Nothing in this section shall authorize anyone other than an individual licensed as a professional engineer pursuant to Chapter 4 of Title 54.1 to engage in the practice of engineering.

D. The provisions of this section shall not apply to any locality that has entered into a contract with the Board of Health in accordance with Chapter 678 of the 1994 Acts of Assembly nor to a proprietary, pre-engineered septic system deemed by the Department to comply with the Board’s regulations.

1999, c. 1038; 2001, c. 337; 2016, c. 90.