A. Notwithstanding other provisions of this chapter, for purposes of permit approval, the Board, Commissioner, and Department of Health shall accept treatment works designs from individuals licensed as professional engineers pursuant to Chapter 4 of Title 54.1. The designs shall (i) be compliant with standard engineering practice and performance requirements established by the Board and those horizontal setback requirements necessary to protect the public health and the environment, (ii) reflect that degree of skill and care ordinarily exercised by licensed members of the engineering profession practicing at the time of performance, (iii) be appropriate for the particular soil characteristics of the site, and (iv) ensure that the treatment works will meet or exceed the discharge, effluent, and surface and ground water quality standards for systems otherwise permitted pursuant to the regulations implementing this chapter.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Virginia Code 32.1-163.6

  • Appeal: A request made after a trial, asking another court (usually the court of appeals) to decide whether the trial was conducted properly. To make such a request is "to appeal" or "to take an appeal." One who appeals is called the appellant.
  • Department: means the State Department of Health. See Virginia Code 32.1-3
  • in writing: include any representation of words, letters, symbols, numbers, or figures, whether (i) printed or inscribed on a tangible medium or (ii) stored in an electronic or other medium and retrievable in a perceivable form and whether an electronic signature authorized by Virginia Code 1-257
  • Locality: means a county, city, or town as the context may require. See Virginia Code 1-221
  • Maintenance: includes pumping the tanks or cleaning the building sewer on a periodic basis. See Virginia Code 32.1-163
  • Operation: means the biological, chemical, and mechanical processes of transforming sewage or wastewater to compounds or elements and water that no longer possess an adverse environmental or health impact. See Virginia Code 32.1-163
  • Owner: means the Commonwealth or any of its political subdivisions, including sanitary districts, sanitation district commissions and authorities, any individual, any group of individuals acting individually or as a group, or any public or private institution, corporation, company, partnership, firm or association which owns or proposes to own a sewerage system or treatment works. See Virginia Code 32.1-163
  • Process: includes subpoenas, the summons and complaint in a civil action, and process in statutory actions. See Virginia Code 1-237
  • Regulations: means the Sewage Handling and Disposal Regulations, heretofore or hereafter enacted or adopted by the State Board of Health. See Virginia Code 32.1-163
  • Sewage: means water-carried and non-water-carried human excrement, kitchen, laundry, shower, bath or lavatory wastes, separately or together with such underground, surface, storm and other water and liquid industrial wastes as may be present from residences, buildings, vehicles, industrial establishments or other places. See Virginia Code 32.1-163
  • state agency: means the same as that term is defined in § Virginia Code 1-206
  • Treatment works: means any device or system used in the storage, treatment, disposal or reclamation of sewage or combinations of sewage and industrial wastes, including but not limited to pumping, power and other equipment and appurtenances, septic tanks, and any works, including land, that are or will be (i) an integral part of the treatment process or (ii) used for ultimate disposal of residues or effluents resulting from such treatment. See Virginia Code 32.1-163

B. The Department may conduct such review of the work and field analysis as deemed necessary to protect the public health and integrity of the Commonwealth’s environment.

C. Within 21 calendar days from the date of application for treatment works sized at 1,000 gallons per day or smaller, and within 60 calendar days from the date of application for treatment works sized at more than 1,000 gallons per day, the Department shall (i) issue the requested approval, or (ii) set forth in writing the specific reasons for denial.

D. The Department shall establish an engineering design review panel to review the Department’s decision to disapprove an onsite sewage system design. The Commissioner shall appoint four individuals licensed as professional engineers pursuant to Chapter 4 of Title 54.1 with expertise in onsite sewage systems to serve on the engineering design review panel with (i) one representing the Department of Health, (ii) one representing the Department of Environmental Quality, (iii) one representing the Virginia Society of Professional Engineers, and (iv) one representing the American Council of Engineering Companies of Virginia. If a state agency is unable to provide a representative in accordance with this subsection, the Commissioner shall appoint another individual licensed as a professional engineer pursuant to Chapter 4 of Title 54.1 with expertise in onsite sewage systems. The members of the design review panel shall appoint a member to serve as Chairman. The design review panel shall be designated a subordinate, as defined in § 2.2-4001, and shall meet as necessary.

E. When the Department denies an application pursuant to subsection D, the owner may appeal that decision in accordance with § 32.1-164.1. Alternatively, the owner, or the professional engineer responsible for an onsite sewage system design with the owner’s written consent, may request an informal fact-finding conference before the engineering design review panel established in subsection D. The request must (i) be in writing, (ii) be received by the Commissioner within 30 days of the professional engineer’s receipt of the Department’s denial, and (iii) cite the reason or reasons for the request. The informal fact-finding conference shall be held within 45 calendar days of the request. The proceedings of the engineering design review panel shall be governed by the provisions of the Administrative Process Act (§ 2.2-4000 et seq.). Within 30 days following its receipt of the engineering review panel’s written recommendations, the Department shall consider the recommendations of the engineering design review panel and approve the application or re-affirm its denial.

F. When the Department denies an application following review by the engineering design review panel, the owner may appeal that decision in accordance with § 32.1-164.1.

G. This section shall not be construed to require an owner to seek review by the engineering design review panel before appealing a permit denial pursuant to § 32.1-164.1.

H. This section shall not be construed to prohibit any locality from adopting or enforcing any ordinance duly enacted pursuant to Chapter 21 of Title 15.2.

I. All treatment works designs permitted pursuant to this section shall comply with operation, maintenance, and monitoring requirements as set forth in regulations implementing this chapter.

2008, c. 515; 2009, cc. 97, 220, 296.