Washington Code 4.16.325 – Actions or claims arising from construction defect claims — Statute tolled
Current as of: 2023 | Check for updates
|
Other versions
If a written notice of claim is served under RCW 64.50.020 within the time prescribed for the filing of an action under this chapter, the statutes of limitations for construction-related claims are tolled until sixty days after the period of time during which the filing of an action is barred under RCW 64.50.020.
[ 2002 c 323 § 8.]