Indiana Code > Title 13 > Article 18 > Chapter 27 – Erosion and Sediment Control in Construction Projects
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Indiana Code > Title 13 > Article 18 > Chapter 27 - Erosion and Sediment Control in Construction Projects
- construction activities: include clearing, grading, and excavating. See Indiana Code 13-18-27-2
- construction plan: means a written plan that:
Indiana Code 13-18-27-3
- erosion: means the detachment and movement of soil, sediment, or rock fragments by water, wind, ice, or gravity. See Indiana Code 13-18-27-4
- general permit: refers to the general permit issued by the commissioner or the department in accordance with Indiana Code 13-18-27-6
- in writing: include printing, lithographing, or other mode of representing words and letters. See Indiana Code 1-1-4-5
- large construction activity site: means :
Indiana Code 13-18-27-7
- project site owner: means the person required to comply with 327 IAC 15-5, the general permit, or the applicable ordinance of an MS4 community with respect to a construction project. See Indiana Code 13-18-27-9
- review authority: means either of the following:
Indiana Code 13-18-27-10
- sedimentation: means the settling and accumulation of unconsolidated sediment carried by storm water runoff. See Indiana Code 13-18-27-11
- small construction activity site: means :
Indiana Code 13-18-27-12
- trained individual: means an individual who is trained and experienced in the principles of storm water management, including erosion and sediment control, as demonstrated by:
Indiana Code 13-18-27-13
- very small construction activity site: means a site at which construction activities result in land disturbance of less than one (1) acre. See Indiana Code 13-18-27-14